Complete Lines & Waste Processing

Turnkey lines for North African industry. We assemble equipment from our European partner factories and commission it on your site — with process technologist support where needed.
[Complete Lines & Waste Processing]

Phosphate Processing Line

• For phosphate rock, phosphogypsum.
• Capacity: 0.5–100 t/h.
• Process: crushing → grinding (pendulum mill) → classification → compaction → storage.
• Partners: NEA, CPC, Sahut-Conreur, GKM, Knoblinger.
• Key feature: configured for OCP-grade phosphate rock. Pilot testing available at NEA facility in Germany.
Discuss Your Project
[Complete Lines & Waste Processing]

Fertilizer Granulation Line

• Application: production of granulated and blended fertilizers — MAP, DAP, NPK, ammonium sulphate — from phosphate-based and mixed mineral feedstocks.
• Capacity: 1–50 t/h.
• Partners: Sahut-Conreur, Mixaco, Knoblinger, Avantechno.
• Key feature: complete downstream line from phosphate concentrate to packed granulated fertilizer — one contract, full responsibility. Directly relevant to Morocco's OCP downstream strategy and Algeria's Fertial fertilizer operations.
Discuss Your Project
[Complete Lines & Waste Processing]

Powder Coating & Paint Production Lines

• Scope: dosing, mixing, extrusion, cooling, grinding, classification, packing
• Capacity: 50 kg/h – 5 t/h.
• Particle size: 10–100 µm (adjustable).
• Partners: Mixaco, Xtrutech, NEA, GKM, Avantechno.
• Key feature: complete line from our partner equipment. In-house process technologist supports formulation and commissioning.
Discuss Your Project
[Complete Lines & Waste Processing]

Salt Processing Plant

• Application: technical and pharmaceutical salt production.
• Capacity: 1–50 t/h.
• Purity: up to 99.9% NaCl.
• Process: evaporation, crystallization, washing, drying, classification, packing.
• Partners: SEP, Knoblinger, Avantechno.
• Key feature: from brine to packed product, modular for phased expansion. Relevant for Morocco's Atlantic coast salt operations and Tunisia's Sebkha production.
Discuss Your Project
[Complete Lines & Waste Processing]

Recycling & Waste Sorting Complexes

• For plastics, e-waste, cables, glass, construction waste, slag, including phosphogypsum valorization for construction or agricultural use.
• Capacity: 100 kg/h – 20 t/h.
• Process: shredding, crushing, density separation, classification, briquetting.
• Partners: ATM, Trennso, CPC, Sahut-Conreur.
• Key feature: dry separation without water, high purity output.
Discuss Your Project
[Complete Lines & Waste Processing]

Pilot Plant for Mineral Processing

• Purpose: test your material on real equipment before full-scale investment.
• Capacity: 50–500 kg/h.
• Process: configurable: crushing, grinding, classification.
• Key feature: validate technology and product quality before you commit.
• Typical sample: 20–50 kg. Testing at partner facilities in Germany. Results in 2–3 weeks.
Request Pilot Testing
Also in our portfolio
From Material Test to Full Production
Send us a sample of your material. We test it on our partners' pilot equipment in Europe, confirm the process parameters, and only then build your full-scale line. No surprises, no wasted investment.
Let’s Discuss Your Project
No obligation. Send us your material specification — we’ll reply with a technical proposal and timeline.

شريك أوروبي موثوق — هنا في المغرب

(A trusted European partner — here in Morocco.)


WhatsApp: +212 6 68 74 06 12

Landline: +212 5 22 86 58 85

info@philipp-an.de

Office:

Bd. Abdelmoumen, résidence Metropol, bureau 22, Casablanca, Maroc.


Service Area:

Morocco · Egypt · Algeria · Sudan · Libya · Tunisia · Eritrea